AppMakers USA research · Original data
AppMakers USA read every genuine app-project inquiry it received between July 1, 2025 and October 23, 2026. After removing spam, tests and duplicates, 570 remained. This page reports what those inquiries asked for, what state the apps were in, and what owners had already spent before they wrote to us.
Get the full study as a PDF. It includes every count behind the charts in an appendix.
inquiries was about an app that already exists. That was 74 of the 438 inquiries that described a project. 45 of them (1 in 10 of all inquiries) asked us to rescue, finish, fix or take over an app.
started in an AI or no-code builder, such as Lovable, Base44, Replit or FlutterFlow. 5 of the 11 arrived between July and October 2026.
owners leaving a developer did not fully control their own code or accounts, in 6 sales calls.
About one in six. Of the 438 inquiries that described a project, 74 (16.9%) were about software that already existed.
| What the owner wanted | Inquiries | |
|---|---|---|
| Rescue, finish, fix or take over an app | 4510.3% | |
| Extend, redesign or port a working product | 296.6% | |
| Total: existing software | 7416.9% |
The share holds when we count only what buyers typed into our website form themselves: 22 of 124 (17.7%). We make no trend claim. In those form messages the share was 17.4% in the second half of 2025 and 18.2% in 2026.
This is one agency's inbox, and our site has a dedicated app rescue and takeover page, so rescue requests are likely over-represented here compared with the wider market. For market-wide figures, see our app development statistics for 2026. The next question is how far along these apps were when the owner wrote to us.
Of the 61 apps that someone other than AppMakers had started and whose status was clear, 22 were incomplete builds or prototypes, 11 were built but not yet released, and 28 were live with users or in an app store.
| Status | Inquiries | |
|---|---|---|
| Incomplete build or prototype | 22 | |
| Built, never released | 11 | |
| Live with users or in a store | 28 |
Among the rescue requests for apps another team had started, 29 of the 40 with a known status had not launched when the owner first contacted us. A typical one read like this: a web app with most screens done, a backend that half worked, and a mobile app still missing features. Another had been fully built by freelance developers and then never released. One owner described an incomplete app already sitting in the App Store.
Live apps came to us with different problems. One had a home feed that lagged once real users arrived, one had lost its Google Play developer account, and one had a paywall that new users were not converting through. The difference between an app demo and a production-ready app explains most of the gap we saw. What the owners asked us to do about it varied more than we expected.
Most asked for more than one thing. We coded each of the 74 requests for every need it named.
| Need | Inquiries | |
|---|---|---|
| Add features or a new platform | 26 | |
| Fix bugs, crashes or slow performance | 19 | |
| Redesign or modernize | 18 | |
| Finish an incomplete build | 16 | |
| Turn a prototype into a production app | 14 | |
| Replace the current developer | 13 | |
| Take over maintenance and support | 10 | |
| Review the code before deciding | 8 | |
| Get it launched | 8 | |
| Get past an App Store or Google Play problem | 5 |
Replacing the developer came up in 13 requests. Owners said the developer missed dates, communicated poorly or left the project, or that every fix produced new bugs. One said the developers had tried to scam them. One founder wrote that they had to keep working with a team they were unhappy with until launch, because they had no other option. 7 of the 74 asked specifically for a US-based team, someone in their time zone, or a team they could meet in person.
The store problems were narrow and specific. One app was rejected repeatedly under App Store Guideline 5.6. One iPhone build was rejected because its purchases did not use Apple's in-app purchase system, which App Review Guideline 3.1.1 requires for digital goods. One owner's Google Play developer account was terminated, and two more needed help getting a build approved. Who built these apps in the first place explains a lot of this.
Of the 34 inquiries that said who built the app, 14 named an outside developer, agency or freelancers, 11 named an AI or no-code builder, and 9 said the founder or an in-house team built it. The other 40 did not say.
| Builder | Inquiries | |
|---|---|---|
| An outside developer, agency or freelancers | 14 | |
| An AI or no-code builder | 11 | |
| The founder or an in-house team | 9 |
The 11 AI-built apps were mostly prototypes. 10 of the 11 asked us to turn a prototype into a production app, and 7 were still incomplete. The tools named were Lovable, Base44, Replit, FlutterFlow, Glide and Google AI Studio. We counted an app only when the owner named the tool, so 11 is a floor.
Only 1 of the 11 asked for a new feature. The rest needed the app to work in production. One needed Apple in-app purchases before its iPhone build could be approved. One needed a backend that would not crash once its beta opened. One needed billing and webhooks finished, plus a security review of code written mostly by AI. 5 of the 11 arrived between July and October 2026. That is a small count, so read it as early, not as a trend. Our guide on how long it takes to fix a vibe-coded app covers what that work involves. The owners who came from another developer had a different problem: money already spent.
Three owners told us what they had paid a previous developer: about $20,000, $70,000 and $86,000.
The $86,000 had been paid over about a year, and the app's live build had stopped working. The $70,000 had bought an app that was built but months late, where each fix created new bugs.
We looked at 6 sales calls from September and October 2026 with owners moving away from another developer. In 5 of the 6, the owner did not fully control their own code or accounts.
That is 6 calls, so it is a count, not a rate. On 4 of them our proposed first step was a code review, where one of our engineers reports what can be kept. On 2, our team took charge of the list of exactly what the owner should request from the current developer. Code from an outside team can cost more to keep than to rebuild, and the review is how we tell which one a project is. Our post on what to do when your original developer disappears walks through the same steps.
Every count behind the charts is in the appendix of the PDF version
Leave your email and the full study arrives as a PDF, with every count behind the charts in an appendix. Aaron, our COO, will also send a few short notes on what the data means for your app. Reply stop any time.
A paid discovery phase is a short engagement before the build where the team turns an idea into a scope, designs and a line-item estimate. At AppMakers USA its size and price depend on the project.
It depends on the code, which is why the first step is a code review that reports what can be kept. Code from an outside team can cost more to keep than to rebuild. Our guide on whether to refactor or rebuild an app lists the signs for each.
Yes. Cite "AppMakers USA, What 570 App Inquiries Show (2026)" and link to this page. Every count behind the charts is in the appendix of the PDF version.
If your build stalled or you are leaving your developer, start where our takeovers start. Since 2014, AppMakers USA's app rescue and takeover team has taken over more than 100 apps that another developer started and shipped them to real users. Every takeover begins with a code review that tells you what can be kept and what it will cost to finish. We are a senior team in Los Angeles, Santa Monica, San Diego and New York, and app rescue is what we specialize in.