Home
Our Process
Portfolio
FAQ
Where can I see your previous work?
Check out our portfolio at AppMakersLA.com/portfolio
What services do you offer?
We are a Los Angeles app and web development company. As such, we offer: 1) Design for Apps, Webapps and Websites 2) Mobile App Development for iPhone Apps, Android Apps and iPad Apps & Web Development for Webapps. Each project includes full QA Services as well as a product manager.
Where are your app developers located?

Our app developers are mainly located at 1250 S Los Angeles St, Los Angeles, CA 90015, though we have other offices around the world, and we hire the best developers wherever and whenever we find them. If having engineers & designers in Los Angeles is critical to the project, we have the resources to make that happen.

How much do you charge for your services?
Our cost varies depending on the project. Please contact us for a mobile app development consulting session and we will get you an estimate + analysis pronto.
Can you build software for startups?
Yes, we consider ourselves a startup app development company, as well as an agency that builds software for already established firms.

Discover 30+ more FAQs
View all FAQs
Blog
About
Phone number copied!
Contact ussms IconCall Icon
We answer our phones!
App Development / How Apple and...

How Apple and Google Approve Apps Differently, and What It Means for Your Launch

The App Store vs Google Play approval process looks alike from the outside. You upload a build, fill in a listing, and wait. In practice, the two stores stop apps at different stages.

Apple reviews most submissions within a day, then rejects on judgment calls no checklist fully covers. Google often clears review quickly, but a new personal developer account has to run a 14-day closed test with 12 testers before it can publish at all. Plan your launch around one store’s process and you will lose weeks in the other.

What Is Actually Different Between App Store and Google Play Review?

App Store reviews 90% of apps in under 24 hours, while Google Play needs a 14-day closed test and up to 7 days of review before launch

Apple puts most of its friction into the review itself. Google puts most of it before and around the review, in account gates, testing rules, and build requirements. That difference decides how you should plan a two-store launch.

 Apple App StoreGoogle Play
Developer account$99 a year$25 one time
Gate before first public releaseNone required, TestFlight optionalNew personal accounts: 12 testers opted in for 14 straight days, then a production application
Review styleHuman review of every submission and updateAutomated checks plus human review, with longer reviews for some accounts
Stated review time90% of submissions reviewed in under 24 hoursUp to 7 days or longer for some accounts
Build requirement in 2026Built with the iOS 26 SDK or later since April 28, 2026Target Android 16 (API 36) since August 31, 2026
Top published rejection causeGuideline 2.1, App Completeness (over 40% of unresolved issues)Google publishes no equivalent figure

The review-time numbers come straight from each store. Apple says 90% of submissions are reviewed in less than 24 hours. Google’s publishing help says some developer accounts get a more thorough review that can take up to seven days or longer. Neither number includes the time you spend fixing what they find.

So the fast store is not always the one that gets you live first. Apple usually shows its hand within a day, and that is where the first surprises tend to come from.

Where Does Apple Slow a Launch Down?

App review loop where each rejection sends the build back to fix and resubmit, with an appeal option to the App Review Board

Apple slows a launch down through judgment calls, not paperwork. Its reviewers use the App Review Guidelines, and many of those guidelines depend on how a reviewer reads your app.

The biggest single cause is plain incompleteness. Apple reports that over 40% of unresolved issues fall under guideline 2.1, App Completeness. That covers crashes, placeholder content, broken links, missing privacy policies, and inaccurate screenshots. It also covers a common first-launch mistake, which is giving the reviewer no way in. If your app needs a login, Apple requires an active demo account or a full demo mode, and your back end has to be running while they test.

Then come the rules that depend on what your app does:

  •         User-generated content (1.2). Apps with content from users need filtering, a way to report offensive content, the ability to block abusive users, and published contact information.
  •         Account deletion (5.1.1). If users can create an account in your app, they must be able to delete it inside the app.
  •         Third-party login (4.8). If your main sign-in is a social login, you usually need an equivalent option that limits data collection to name and email.

The judgment calls are harder to plan for. We worked on a couples date-planning app that was far milder than many apps already in its category. Apple still sent it through a long series of rejections. The logo drew scrutiny. So did “user-generated content” concerns, even though the app had no public sharing. Apple asked for blocking and reporting features anyway. Getting approved took multiple appeals, calls with Apple support, and several changes to the product and its presentation.

After that project, we started evaluating App Store policy risk in discovery instead of treating it as a release-stage problem. Wording, branding, and anything that looks like shared content get checked against the guidelines before design is final. An iOS development team that has been through this can spot those risks early. Many repeat rejections trace back to architectural choices that keep failing review, and those are cheaper to catch on a whiteboard than in a rejection email.

Stuck in an App Store rejection loop? AppMakers USA reads the rejection history and the codebase together, then tells you what has to change for the next submission to pass.

Let’s Fix Your App →

Google rarely argues about your logo. Its friction shows up before a reviewer ever sees your app.

Where Does Google Play Slow a Launch Down?

New Google Play account path: create account, upload to closed testing, 12 testers for 14 days, apply for production, review, then live

Google Play slows a new launch down with a mandatory test period. If your personal developer account was created after November 13, 2023, Google requires a closed test with at least 12 testers who stay opted in for at least 14 days in a row. Testers who drop out early do not count.

After that, you apply for production access. The form asks about your closed test, your app and audience, and what you changed based on tester feedback. Google says it reviews that application in seven days or less, though it can take longer. Only then can you submit to production, which has its own review.

Add it up and a brand-new personal account needs about three weeks before an Android app can reach the public. That surprises founders who planned both launches for the same week. Organization accounts skip the 12-tester rule, but they need a D-U-N-S number, and getting one can take time of its own.

Google also has paperwork Apple handles differently:

  •         Data safety form. Every app declares what data it collects and shares. This is the Google version of Apple’s privacy labels, and a mismatch with what the app does is a common policy flag.
  •         Account deletion. Like Apple, Google requires an in-app path to delete an account. Google also requires a web link where users can request deletion without reinstalling the app.
  •         Developer verification. Starting September 30, 2026, Android developer verification is enforced in Brazil, Indonesia, Singapore, and Thailand, with a global rollout planned. Google says 99% of Play apps were registered automatically, but it is worth confirming on your Play Console home page.

A strong Android development team plans the closed test as part of the build schedule, not as a surprise at the end. The same goes for the build requirements both stores now enforce before a reviewer ever looks at your app.

Which Technical Requirements Can Block an Upload in 2026? 

Build requirements: Apple requires the iOS 26 SDK since April 28, 2026, and Google Play requires target API 36 and 16 KB page size support

Both stores now refuse builds that miss their current platform requirements, no matter how good the app is. These checks run on upload, before any human review.

StoreRequirementIn force sinceWho gets caught
AppleBuilt with the iOS 26 SDK or laterApril 28, 2026Apps last built with an older Xcode
Google PlayTarget Android 16 (API 36)August 31, 2026 (extensions to November 1, 2026)New apps and every update
Google PlaySupport 16 KB memory page sizesNovember 1, 2025Apps targeting Android 15+ with native code or old native libraries

The 16 KB rule is the one that bites cross-platform apps. Pure Java or Kotlin apps are already fine. Apps with native code, or with third-party libraries that ship native code, may need updated dependencies or a rebuild with a newer toolchain.

We hit this on a community quiz app built with React Native and Expo. Late in Android release prep, Google Play began enforcing 16 KB page-size support for newer Android targets. Parts of the stack were outdated and tied to older native dependencies, so the fix turned into a migration instead of a config change. The iOS side had its own surprise. TestFlight builds crashed at runtime in ways that never reproduced in the simulator, so everything looked stable internally until real distribution started.

Both problems had the same root cause. Dependencies had drifted for too long. When a store requirement changes, an app with current dependencies needs a rebuild. An app with stale ones needs a project. A code audit before a release finds that drift while there is still time to fix it calmly.

With the rules for each store in view, the remaining question is how to sequence one launch across both.

How Do You Plan One Launch Across Both Stores?

Launch plan running iOS and Android paths in parallel, with the Android closed test started early so both releases meet on one launch day

Start the Android clock first, and treat the Apple review as the last step instead of the first. Google’s gate runs on a fixed calendar. Apple’s runs on how clean your submission is.

  1.       Open both developer accounts early. Organization accounts on both stores need a D-U-N-S number, so request it at the start of the project.
  2.       Start the Google Play closed test as soon as a stable build exists. The 14 days only start counting once 12 testers are opted in.
  3.       Check both build requirements before the first upload. iOS 26 SDK for Apple, API 36 and 16 KB support for Google.
  4.       Prepare the reviewer’s path into the app. A working demo account, a live back end, and clear notes for anything that needs hardware or a QR code.
  5.       Fill in the privacy paperwork from the real app. Apple’s privacy labels and Google’s Data safety form should match what the code actually collects.
  6.       Use TestFlight while the Android test runs. Real devices catch crashes the simulator will not.
  7.       Submit to Apple last and hold the release. Both stores let you approve a build now and release it later, so you can launch on the same day.

A soft launch to a smaller audience fits neatly into this plan. It gives you real-world data on both platforms before the big push. If one codebase serves both stores, AppMakers USA plans both review tracks on one schedule for cross-platform builds. For a first version on a tight timeline, like a 30-day MVP, store submission belongs on the schedule from week one, not launch week.

Launching on both stores and short on time? AppMakers USA plans the Android closed test, the Apple review, and the release date together, so both stores go live on your schedule.

Talk to Our Team Today →

Even with a clean plan, the same handful of questions come up on almost every launch.

Shir Keren

Shir Keren

Shir Keren is a Project Manager and QA Analyst at AppMakers USA, where she helps turn complex ideas into polished, high-performing mobile and web apps. With experience across project management, quality assurance, and workflow optimization, she brings structure, clarity, and user-focused thinking to every build.

Ready to Develop Your App?

Partner with App Makers LA and turn your vision into reality.
Contact us

Frequently Asked Questions (FAQ)

You can appeal to Apple’s App Review Board. You get one appeal per rejected submission, and it must explain specifically why the app follows the guidelines. Answer any open questions from the reviewer before you file it.

Yes, on both stores. Apple reviews every update, and Google reviews updates too, with longer checks for some accounts. Google’s managed publishing lets you approve an update now and choose exactly when it goes live.

Yes, in limited cases. Apple accepts expedited review requests for critical bug fixes, with steps to reproduce the bug, and for apps tied to an event that is about to happen. It is not meant for regular launches.

No. Each store reviews the build it receives, not the framework behind it, so a cross-platform app still needs two submissions, two listings, and two sets of privacy declarations. The framework matters only at upload, where native libraries decide whether you meet requirements like Google’s 16 KB rule.

Yes. The closed-test requirement applies to personal accounts created after November 13, 2023. Organization accounts need a D-U-N-S number and more verification instead.

See more
Chevron-1

Plan Both Launches Before You Write the Code

Store approval is not a final step you bolt on after the build. Apple’s judgment calls and Google’s fixed-calendar gates both punish teams that meet them for the first time in launch week. AppMakers USA plans both stores during discovery, checks policy risk before design is final, and flags stale dependencies early so a new store requirement means a rebuild, not a rescue. Google’s 14-day clock does not move for anyone, so the earlier it starts, the earlier you launch.

Get a launch plan that clears both stores. AppMakers USA will scope your build, map both review tracks, and give you a realistic go-live date before any code is written.

Get a Free Project Estimate →


Exploring Our App Development Services?

Share Your Project Details!

Vector-60
We respond promptly, typically within 30 minutes!
Tick-4
  We’ll hop on a call and hear out your idea, protected by our NDA.
Tick-4
  We’ll provide a free quote + our thoughts on the best approach for you.
Tick-4
  Even if we don’t work together, feel free to consider us a free technical
  resource to bounce your thoughts/questions off of.
Alternatively, contact us via phone +1 310 388 6435 or email [email protected].

    Protect Under NDA

    Copyright © 2026 AppMakers. All Rights Reserved
    Follow us on socials:
    linkedin facebook pinterest youtube rss twitter instagram facebook-blank rss-blank linkedin-blank pinterest youtube twitter instagram